{"product_id":"srw-products-pavermate-z3-polymeric-sand","title":"SRW Products Pavermate Z3™ Polymeric Sand","description":"\u003cp\u003eAt SRW Products, our Pavermate Z3™ provides fast, powerful, and long-lasting results for a variety of paver applications. Our one-sand solution for paver joints ensures clean, rain-safe installation with quick set-up. As the best polymeric sand on the market, you can expect zero haze or dust, strong joints, and longevity.\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eZero Haze:\u003c\/strong\u003e Clear polymer technology, along with the removal of Portland, Fly Ash \u0026amp; Crushed Limestone (which are ingredients that cause hazing) set you up for a haze-free project. \u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eZero Dust:\u003c\/strong\u003e Specifically mixed to bind polymers and sand, reducing fines and creating a dust-free product. \u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eZero Problems:\u003c\/strong\u003e Rain safe in just 10 minutes. Fastest set up time in the market helps with unforeseen weather.\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003ePavermate Z3™ Instructions\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003ePreparation\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eInstall pavers using manufacturer’s guidelines for bedding, leveling and installation. Fully clean off debris from the project area.\u003cbr\u003eInstallations should have a proper drainage layer of sand with a depth of 1″ (2.54 cm). In addition, weep holes need to be added to concrete overlays.If it’s an existing project, properly clean out joints before applying polymeric sand and skip to step \u003c\/p\u003e\u003cp\u003eCompact pavers thoroughly using a rubber-plated compactor.\u003cbr\u003eIf compactor is not rubber-plated, cover pavers with a woven fabric while compacting to help protect paver surface from damage.Pavers must be completely dry before installing polymeric sand. Wait 24 hours after rain.\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eApplication\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eGently tumble the bag, then cut the bottom and apply Pavermate Z3™ evenly over the surface.\u003c\/p\u003e\u003cp\u003eSpread sand into joints, completely filling to the full depth of the pavers.\u003cbr\u003eAvoid pushing sand over long distances.\u003c\/p\u003e\u003cp\u003eRemove excess sand from the surface of the pavers before compacting.\u003c\/p\u003e\u003cp\u003eCompact filled joints using a rubber-plated compactor.\u003cbr\u003eRepeat compacting and filling if necessary.\u003c\/p\u003e\u003cp\u003eRemove excess sand from the paver surface using a soft bristle broom and set the joint height with a leaf blower on idle.\u003cbr\u003eOnce complete, joint height should be filled to 1\/8″ (.32 cm) below the top of the paver.\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eActivation\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eWorking in sections up to 200 sq. ft. (18.58 sq. m.), water the section for a total of 2 minutes using all three applications of water below. \u003c\/p\u003e\u003cp\u003eDo not allow the section to dry during the 2 minute watering.Do not allow the section to dry during the 2-minute watering:\u003cbr\u003eMIST: Use a hose with a sprayer attachment set to “mist” or a similar light setting. Mist the area until the surface is wet.\u003c\/p\u003e\u003cp\u003eSHOWER: Next, set the hose to “light shower” to allow more water over the area. Repeat the shower two times over the section.\u003c\/p\u003e\u003cp\u003eUse a screwdriver to test for proper moisture depth of at least 1″ (2.54 cm). If depth is not achieved, immediately wet the area with a shower setting.\u003c\/p\u003e\u003cp\u003eOnce moisture depth is achieved, blow off excess water using a leaf blower.\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eCuring\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003ePavermate Z3™ is rain-safe in 10 minutes after joint activation.\u003cbr\u003eA flexible joint is a sign that a reaction has occurred but is not completely cured.\u003c\/p\u003e\u003cp\u003eA dry environment is important to allow joints to fully cure. For best performance, install when no rain is forecasted for 24 hours.\u003c\/p\u003e\u003cp\u003eWait 28 days prior to cleaning or sealing.\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eUser Tips\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eJOINT SIZE\/TYPE\u003c\/strong\u003e\u003cbr\u003eJoint Width: Recommended for joints between 1\/16″ to 2″ (.16 cm to 5.08 cm) at intersecting points. For concrete overlays, a maximum of 1″ (2.54 cm) wide joints at intersecting points is recommended.\u003c\/p\u003e\u003cp\u003eJoint Depth: Minimum depth of 1 ½” (3.81 cm).\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eCOVERAGE\u003c\/strong\u003e\u003cbr\u003eNarrow Joints: Typical coverage is 55 – 75 sq. ft. (5.11 – 6.97 sq. m.) per bag.\u003c\/p\u003e\u003cp\u003eWide Joints: Typical coverage is 20 – 30 sq. ft. (1.86 – 2.79 sq. m.) per bag.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eINSTALLATION\u003c\/strong\u003e\u003cbr\u003eTest in a small discrete area.\u003c\/p\u003e\u003cp\u003eTemperatures must remain above 32°F (0°C) throughout installation and curing.\u003c\/p\u003e\u003cp\u003eNot recommended for flagstone patios or wet\/heavily shaded areas. Do not use on pool copings.\u003c\/p\u003e\u003cp\u003eNot for use on porcelain tile or natural stone.\u003c\/p\u003e\u003cp\u003eClay pavers must be completely dry prior to sand install. Moisture in the clay pavers can activate the sand on the surface and leave a residue.\u003c\/p\u003e\u003cp\u003eProper compaction is very important for obtaining optimal joint strength.\u003c\/p\u003e\u003cp\u003eContinuous dampness can prevent polymeric sand from curing properly. Irrigation systems should be turned off until polymeric sand has fully cured.\u003c\/p\u003e\u003cp\u003eFor best results, wait 28 days after installation before cleaning and sealing.\u003c\/p\u003e","brand":"SRW Products","offers":[{"title":"50 LB \/ Tan","offer_id":48103346077931,"sku":"JOINTSAND","price":45.5,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0746\/1430\/9099\/files\/product-media-455654.webp?v=1776338493","url":"https:\/\/randalltaos.com\/products\/srw-products-pavermate-z3-polymeric-sand","provider":"Randall Lumber \u0026 Hardware","version":"1.0","type":"link"}